Wind-Integrated Simultaneous Generation and Transmission Expansion Planning Considering Short-Circuit Level Constraint

نویسندگانHamid Falaghi
نشریهIET Generation, Transmission and Distribution
شماره صفحات2808-2818
شماره سریال13
شماره مجلد13
ضریب تاثیر (IF)2.213
نوع مقالهFull Paper
تاریخ انتشار2019
رتبه نشریهISI
نوع نشریهچاپی
کشور محل چاپایران
نمایه نشریهJCR،Scopus

چکیده مقاله

In this study, simultaneous generation and transmission expansion planning is presented in the presence of wind farms. Short-circuit current constraint is included in the problem, and the impact of wind farms on short-circuit current is evaluated. This study presents a novel approach for reducing short-circuit current in composite generation and transmission expansion planning. In this way, new units and lines are determined such that the short-circuit currents of substations are less than the defined limit. In addition, an optimal level of short circuit is determined and the total cost is reduced. The proposed method is applied to a real case study, and its performance is demonstrated by comparison with other methods.

لینک ثابت مقاله

tags: simultaneous generation and transmission expansion planning, wind farms, short-circuit current constraint