Energy storage systems integrated transmission expansion planning

نویسندگانHamid Falaghi,Majid Oloomi Buygi
نشریهJournal of Energy Management and Technology
شماره صفحات42-53
شماره سریال4
شماره مجلد1
نوع مقالهFull Paper
تاریخ انتشار2020
رتبه نشریهISI
نوع نشریهچاپی
کشور محل چاپایران
نمایه نشریهisc

چکیده مقاله

The transmission network expansion planning is necessary for supplying the future needs, considering load growth. Furthermore, in restructured environments, transmission lines provide the required infrastructure for creating a competitive environment. In recent years, there has been a significant advancement in storage technologies. This advancement leads to using energy storage systems to postpone the construction or replacement of transmission lines. Therefore, in this paper, the problems of transmission expansion planning and energy storage systems deployment are investigated simultaneously. Considering the presence of storage devices and their effect on network operation cost, in this paper, the operation cost is modeled as an independent objective function along with investment cost. Moreover, the problems of transmission and storage expansion planning are modeled as a tri-objective optimization problem with the objectives of reducing costs and increasing the social welfare index in the power market. The multiobjective shuffled frog leaping evolutionary algorithm is used to solve these problems. The presented model for expansion planning is implemented and analyzed on IEEE 24-bus test system in the presence and absence of energy storage systems, and the effect of change in the price of energy storage systems is studied. The results of this research show that as the technology advances and the storage costs decrease, energy storage systems can play a pivotal role in reducing expansion planning costs of the power network and improving market-based indices in the restructured environment.

لینک ثابت مقاله

tags: Energy storage systems, Locational marginal price, Multi-objective optimization, Power market, Transmission expansion planning