| نویسندگان | Hadi Farhadian,Zeynab Maleki,Seyed Ahmad Eslaminezhad |
| نشریه | Journal of hydraulic structures |
| شماره صفحات | 59-76 |
| شماره سریال | 7 |
| شماره مجلد | 1 |
| نوع مقاله | Full Paper |
| تاریخ انتشار | 2021 |
| رتبه نشریه | ISI |
| نوع نشریه | الکترونیکی |
| کشور محل چاپ | ایران |
| نمایه نشریه | isc |
چکیده مقاله
Seepage is one of the most substantial factors in the embankment dams design. The Cutoff wall
method is the ideal construction solution for controlling flow through the foundation of earth dams. In
this study, the cutoff wall method is investigated at the site of the Peygham-Chay dam (Study area).
According to the dam site, in terms of its materials as well as their different permeability, water influx
is a potential hazard at the site. For this purpose, SEEP/W program as the finite element approach was
employed to estimate the seepage and design of the optimum depth of the sealing element. The results
of numerical analyzes imply that the sealing component is not needed because of the low permeability
in the primary 260 m at the left abutment of the dam. Also, the optimum depth of the cutoff wall is
evaluated as 15 m at the rest of the dam axis.
لینک ثابت مقاله